Article 9.5—Article 9.5
>Control Description
The risk management measures referred to in paragraph 2, point (d), shall be such that the relevant residual risk associated with each hazard, as well as the overall residual risk of the high-risk AI systems is judged to be acceptable. In identifying the most appropriate risk management measures, the following shall be ensured:
End - With a view to eliminating or reducing risks related to the use of the high-risk AI system, due consideration shall be given to the technical knowledge, experience, education, the training to be expected by the deployer, and the presumable context in which the system is intended to be used.
>Cross-Framework Mappings
Ask AI
Configure your API key to use AI features.